September 11th:
 
Burying the detention tanks and hooking the system up to the municipal drainage system.
September 17th:
  
Contouring the surface, pouring new curbing around the parking lot.
  
Preparing the surface for seeding. Laying the base for the new playground.
September 26:
  
Hydr0-seeding complete; playground base in place. Waiting for the rain...
 
The grass is growing. Next step, Playground construction.
October 22nd:
A fitting end to a great project.
Mike, Sam, and Josh of DEEMER CONSTRUCTION present our Maintenance Manager Wayne Dailey, with a new flag for the repositioned flag pole. Thanks guys!!!

|